Not just building a kitchen. Designing a system.
We develop professional kitchen solutions suited to your business's capacity, operational needs and service model.
Every business has different needs.
01 Restaurant À LA CARTE · SET MENU
A production line designed around the pace of orders.
In a restaurant kitchen, menu variety shapes the design of the cooking line, while peak service hours determine the prep and refrigeration layout. The goal is for each order to travel from the cooking line to the pass in a short, uninterrupted flow.
Priority systemsCookingPreparationService
- Cooking line based on the menu: range, oven, grill, fryer
- Undercounter refrigeration at the head of the line
- Keeping the pass and service handoff short
- Dishwashing flow suited to peak hours
02 Hotel BREAKFAST · BANQUET · ROOM SERVICE
An operation that changes throughout the day, from breakfast to banquet service.
A hotel kitchen serves different service styles on the same day, such as buffet breakfast, à la carte restaurant, banquets and room service. That's why the main kitchen, buffet line and transport flow are planned together.
Priority systemsServiceCookingRefrigeration
- Hot and cold display for the buffet
- Bulk production and hot holding for banquets
- Large cold storage
- Transport solutions for banquet and floor service
03 Cafe COFFEE · SNACKS · DESSERTS
A compact, bar-focused workflow.
In a cafe, the workflow revolves around the bar counter; coffee preparation, glass washing and display refrigeration take center stage. On the kitchen side, compact cooking and prep equipment are chosen to use limited space efficiently.
Priority systemsServiceRefrigerationDishwashing
- Coffee preparation and bar equipment
- Display and undercounter refrigeration
- Compact cooking: toaster, waffle maker, oven
- Glass washing and drying
04 Hospital DIET KITCHEN · TRAY SERVICE
Hygiene, traceability and separated workflows.
In a hospital kitchen, standard and diet menus are prepared at the same time; distribution is done by tray and hygiene rules determine the workflow. Separating dirty and clean areas, protecting the cold chain and easy-to-clean surfaces form the basis of planning.
Priority systemsPreparationDishwashingRefrigeration
- Separate prep area for diet menus
- Tray preparation and transport flow
- Separation of dirty and clean areas
- Blast chilling and controlled storage
05 Cafeteria MASS CATERING · SELF-SERVICE
High-volume service in short meal windows.
A cafeteria experiences a heavy flow at certain meal times. Cooking equipment suited to bulk production, the self-service line and tray return are the main factors that determine service capacity.
Priority systemsCookingServiceDishwashing
- Bulk production: kettle, tilting pan, oven
- Self-service and bain-marie line
- Tray return and high-capacity dishwashing
- GN pans and transport layout
06 Factory SHIFT KITCHEN · STAFF MEALS
A durable kitchen suited to shift schedules.
A factory kitchen delivers intense service in a short time at shift changes. Durable, easy-to-maintain equipment, large cold storage and a smooth service line take priority.
Priority systemsCookingRefrigerationService
- Durable, easy-to-maintain cooking equipment
- Large cold storage and cold room
- Service line suited to shift peaks
- Food transport and hot holding
Five interconnected systems.
A one-way workflow from cold storage to service; each system is planned together with the areas before and after it.
-
01
Refrigeration
Food safety and controlled cold storage.
Refrigeration equipment is placed to create an uninterrupted cold chain from the receiving point to the prep area.
All refrigeration equipment -
02
Preparation
Efficient and hygienic pre-preparation.
Work tables, sinks and prep machines are arranged in a one-way flow between cold storage and the cooking line.
All preparation equipment -
03
Cooking
Cooking solutions matched to production capacity.
Planned as a single line according to the menu and service pace; the hood and ventilation are designed together with this line.
All cooking equipment -
04
Service
Orderly and efficient service organization.
Equipment is selected according to the service model; transport and tray flow connect to this area.
All service equipment -
05
Dishwashing
Hygienic washing and clean/dirty area management.
Planned as a separate flow, from dirty returns to clean stacking, that does not cross the service area.
All dishwashing equipment
The right start for your kitchen.
Restaurant · 100–300 people
For a restaurant serving 100–300 people a day, the priority systems are: cooking, preparation and service.
Show technical details
Cooking, preparation and service systems are prioritized; menu variety, order volume and prep and service flow are the starting point for planning. The capacity of the refrigeration and dishwashing areas is determined by the daily service volume of 100–300 people and the business's operational needs and working arrangement.
This is a preliminary assessment; the equipment list, quantities and space requirements are finalized after the site survey and kitchen design.
Four stages from site survey to handover.
- 01
Site survey and needs analysis
The space is inspected on site; dimensions and water, gas, electricity and ventilation points are identified. Menu structure, service model and capacity are considered together.
On-site measurement · needs list - 02
Technical design
The kitchen is divided into zones with a one-way workflow from cold storage to service; equipment layout and utility connection points are finalized on the plan.
Layout plan · connection points - 03
Equipment and installation
Equipment suited to the project is selected; installation and connections are carried out on site.
Equipment selection · installation - 04
Commissioning and handover
The equipment is run and checked; handover is completed after user instruction.
Commissioning · user instruction